JSM Building Solutions
EDUCATION
St Johns
School, Great Harwood
• Heating
distribution system renewal
• Existing
heating and distribution pipework stripped out
• New LPHW
distribution pipework, heat emitters and radiators
installed
• Waste
removal from site
• Project
value £110k
• Project
duration 12 weeks
Hazel Grove
High School
• Heating
refurbishment
• Completed
over the summer holidays
•
Project value £400,000
•
Project duration 14 weeks
Abraham Moss
High School
• Heating in
new dining room extension
• Included
underfloor heating
•
Project value £50,000
•
Project duration 3 weeks
St Catherine's Didsbury
• Full boiler
house replacement
•
Replacement and upgrade of heating mains
•
New controls system
•
Project value £75,000
•
Project duration 10 weeks
•
PPM contract entered into to maintain new equipment
LCC Mechanical
& Electrical Reactive Maintenance and Small Works Framework
• 5 year
framework contract awarded June 2016
•
All regions awarded within the county
•
Access to “PAMS” system
•
Engineering staff have long relationships with most
LCC surveyors
Hodgson
Academy
• Remedial
works to boiler houses
• Installation
and commission of gas solenoid cut offs
• Modifications
to incoming gas pipework
• Production of
new record drawings
• Boiler
services
• Waste removal
from site
• Project value
£8,000
• Project
duration 12 weeks (split over 2 phases)
Kings
Leadership Warrington
• Conversion of
admin space to new teaching areas
• Works
developed by JSM from clients brief and budget
• Complete turn
key project M&E and internal fabric works
• Project value
£40,000
• Project
duration 6 weeks
Plymouth Grove
Classroom & Refurbishment
• Alteration to
the electrical, heating and plumbing installation
• Remedial
repair works to kitchens
• Installation
of data and white boards
• Replacement
lights to new LED fittings
• Daylight
sensing installation
• New water
saving devices installed
• Disabled
alarm installation
• Ceiling
repairs
• Project
duration 5 weeks
• Value £12,000